HB3 LEDr

ECE status overview for HB3 LEDr retrofit modules.

Model dossier

Status

HB3 LEDr is tracked as a pipeline category, not an in-force product claim.

Application

High-beam or related retrofit development planning.

Approval route

Formal review path toward GRE95 and later R.E.5 entry-into-force steps.

Buyer risk

Premature approved or street-legal claims can mislead buyers before formal adoption.

Product evidence and manufacturer action

  • Verify the exact product reference and approval basis before using road-use language.
  • Check the lamp function, vehicle scope, installation accessories and target market.
  • Keep category status separate from claims about any specific bulb or kit.
Read the LEDr status briefing

HB3 LEDr

Final technical specifications and justification documents are scheduled for 13 July 2026. GRE95 review is planned for 20-23 October 2026, with expected 2027 entry into force if adopted as the 13th amendment to R.E.5.

GRE95 Review Scheduled